The antigen detection kit is selected for POC scenarios. Will instability in the delivery period delay the acceptance of the project?

Reagent Selection
Asked by:TomBuffer 2026-07-06 Views 163 2 answers
Back to List ✏️ Ask a Question
💡 How to Answer This Question
  1. 1
    Read the Context

    Read the full description, category and tags to understand the real scenario.

  2. 2
    Give an Actionable Answer

    Give concrete steps, cautions and reasoning — not just a conclusion.

  3. 3
    Cite Sources

    Reference standards, papers or product manuals to make the answer more credible.

  4. 4
    Wait for Acceptance

    You will be notified if accepted. Continue the discussion in comments.

Tags:

All Answers2
A
AmyAssay7177 2026-09-28
POC scenarios should not only look at sensitivity parameters, but also on-site executability. When the operator is less trained, the steps of colloidal gold are simple, intuitive to interpret, no instruments are required, and it is suitable for the grassroots; the fluorescence method can reduce subjective interpretation, but it relies on card readers, power supply, temperature control, and quality control maintenance, and the process is more complicated. Budget Within a given interval, it is recommended to use the same batch of clinical retention samples for on-site blind testing, focusing on weak positive line clarity, operating time, waste disposal, and stability after high-temperature transportation. The acceptance priority is to select a program with transparent delivery records and landing after-sales training.
P
PCRing7258 27 days ago
The contract moves the futures risk forward. Clarify how many days before the key acceptance node must arrive, allow batch delivery, but the total batch can not be later than the node; agree on the arrival batch number, production date, the lower limit of the remaining validity period, and the transportation temperature record. In case of peak influenza, the supplier should provide proof of capacity, stocking pool or alternative batch plan, delay to trigger liquidated damages, reissue or return/exchange mechanism. After-sales response Write the response time limit, the time limit for arrival or remote guidance, and the batch problem requires the rectification instructions to be given within the time limit. Cargo appearance, batch number consistency and sampling quality control before acceptance.